Chapter 3 Monitor the Uninterruptable Power Supply 31

Figure 7 UPS status report

7To print the report, select Print this Report from the screen.

8To close the report window, select Close This Window from the screen.

9This procedure is complete.

Test the UPS

Use this procedure to test the UPS power backup function after you have installed and configured the UPS for the Business Communications Manager.

The UPS device automatically performs a biweekly self-test. Locate the test results under the following path:

F:\Program Files\PwerChute\PwrChute.log file.

1Ensure that the serial cable between the Business Communications Manager and the UPS (or the expansion chassis) is securely connected at both ends.

2Simulate a power failure. Disconnect the power cord from the AC power source (wall outlet) to the UPS device.

3Verify that the BCM connected to the UPS device remains operational

UPS Installation and Configuration Guide

Page 31
Image 31
Nortel Networks P0607274 0 manual Test the UPS, UPS status report