11.4.3.EVACUATION OF THE EQUIPMENT
WHEN INSTALLING AN AIR CONDITIONER, BE SURE TO EVACUATE THE AIR INSIDE THE INDOOR UNIT AND PIPES in the following procedure.
1.Connect a charging hose with a push pin to the Low side of a charging set and the service port of the
•Be sure to connect the end of the charging hose with the push pin to the service port.
2.Connect the center hose of the charging set to a vacuum pump with check valve, or vacuum pump and vacuum pump adaptor.
3.Turn on the power switch of the vacuum pump and make sure that the needle in the gauge moves from 0 cmHg (0 MPa) to
4.Close the Low side valve of the charging set and turn off the vacuum pump. Make sure that the needle in the gauge does not move after approximately five minutes.
Note: BE SURE TO FOLLOW THIS PROCEDURE IN ORDER TO AVOID REFRIGERANT GAS LEAKAGE.
5.Disconnect the charging hose from the vacuum pump and from the service port of the
6.Tighten the service port caps of the
7.Remove the valve caps of both of the
8.Mount valve caps onto the
•Be sure to check for gas leakage.
CAUTION
•If gauge needle does not move from 0 cmHg (0 MPa) to
•If the leak stops when the piping connections are tightened further, continue working from step .
•If the leak does not stop when the connections are retightened, repair the location of leak.
•Do not release refrigerant during piping work for installation and reinstallation. Take care of the liquid refrigerant, it may cause frostbite.
11.4.4.CONNECT THE CABLE TO THE OUTDOOR UNIT
(FOR DETAIL REFER TO WIRING DIAGRAM AT UNIT)
1.Remove the control board cover from the unit by loosening the screw.
2.Connecting cable between indoor unit and outdoor unit shall be approved polychloroprene sheathed 4 x 1.5 mm2 flexible cord, type designation 245 IEC 57 or heavier cord.
3. Secure the cable onto the control board with the holder (clamper).
35