4

 

94

93

8

1/2 X 3” 87

 

18

 

 

1

FIGURE 7

 

STEP 7

LOOSELY assemble the PRESS BASE (18) to the REAR (4) & MIDDLE UPRIGHTS (8) using two 1/2 X 3” BOLTS (87), two 1/2” WASHERS (93), and two 1/2” LOCK NUTS (94). See FIGURE 7.

 

92

 

49

 

17

 

49

 

85 3/8 X 2-3/4”

FIGURE 8

43

 

STEP 8

LOOSELY assemble one 4-1/2” PULLEY (43) to the TOP BOOM (17) using one 3/8 X 2-3/4” BOLT (85), two 3/8” FLANGE SPACERS (49), and one 3/8” LOCK NUT (92). See FIGURE 8.

10

Page 10
Image 10
ParaBody 425104 manual X 3