94 | 93 |
93 | 89 1/2 X |
26 | 6 |
| |
25 | 53 |
FIGURE 28 |
|
STEP 28
•SECURELY assemble the BEARING HOUSING (6) and the CENTER PULLEY BRACKET (26) to the FRONT UPRIGHT (25) using two 1/2 X
•Attach two 1 X 1" GUIDES (53) to the ANGLE on the UNDERSIDE of the BEARING HOUSING (6). See FIGURE 28.
|
| 84 3/8 X 2” |
| STEP 29 |
|
|
|
| 91 45 |
| • LOOSELY assemble two | ||
|
| 42 | CENTER PULLEY BRACKET (26) using two 3/8 X 2” | |||
|
|
| BOLTS (84), two | |||
|
|
|
| WASHERS (91), and two 3/8” LOCK NUTS (92). See | ||
|
|
|
| FIGURE29. |
|
|
|
|
|
| (NOTE: This connection wil be tightened after the | ||
|
| 26 |
| cable has been routed.) |
| |
|
|
| 91 |
|
|
|
|
|
| 92 |
|
|
|
FIGURE 29 |
|
|
|
|
|
|
1/2 | 1/2 | 1/2 | 3 | 1/2 | 1/2 | 1/2 |
0 | 1 | 2 | 4 | 5 | 6 | |
|
|
| 25 |
|
|
|