3Z8 x 3"(~
Step 13
,Slide pec guide roC[ support (43..~ onto the pec welght.stack guide rods and Ioosely,,att,,ch it
to the boom twobolts (95), four 5/8 washers (78), and two 3/8 nyiockusing
nuts (83). (Note: This connection will be secured in a later step after the pulleys are assembled.)
B.Slide press guide rod support (24) and leg guide rod support (25) over their respecfiw~ guide rods and securely assemble fl~em fo the boom using two 1/2 x
16