Paradyne 2600 IP DSLAM manual LED Meanings, Led

Models: 2600 IP DSLAM

1 58
Download 58 pages 7.89 Kb
Page 36
Image 36

3. LEDs

LED Meanings

When power is first applied to the unit, it performs a power-on self-test. When this test is successfully completed, the Status LED blinks. The meaning of all the LEDs is shown in Table 3-1, Front Panel LEDs.

Table 3-1. Front Panel LEDs

LED

Color

State

Meaning

 

 

 

 

Link*

Green

Off

No Ethernet link present.

 

 

On

Ethernet Link present.

 

 

Flashing

Ethernet link is present, but port is

 

 

 

administratively disabled.

 

 

 

 

Activity*

Green

Off

No data is being transferred.

 

 

On

Data is being transferred.

 

 

 

 

STATUS

Green

Off

No power, or the unit has not completed

 

 

 

initialization.

 

 

On

Unit has power and has completed initialization.

 

 

 

 

ALARM

Amber

Off

No Alarms.

 

 

On

Unit failed self-test, or the unit has exceeded a

 

 

 

safe temperature, or a fan has failed.

 

 

 

 

TEST

Amber

Off

Normal operating mode.

 

 

On

At least one port is in test mode.

 

 

 

 

DSL Ports

Green

Off

The port is disabled or no signal is detected on

(LEDs

 

 

the line.

numbered 1–24

 

On

Port has successfully trained with the remote

correspond to

 

 

 

and is active.

DSL ports 1–24)

 

 

 

 

 

 

 

 

 

*The three RJ45-type connectors for Port 1, Port 2, and Port 3 bear two LEDs: the left one is the Link LED and the right one is the Activity LED. The SFP socket for Port 3 has two adjacent LEDs marked LINK and ACT.

3-2

January 2004

2600-A2-GN20-10

Page 36
Image 36
Paradyne 2600 IP DSLAM manual LED Meanings, Led