Pelco C1621M-E (9/08) 3 manual Before You Begin, Parts List, Qty Description

Models: C1621M-E (9/08) 3

1 40
Download 40 pages 54.2 Kb
Page 8
Image 8
Before You Begin

Before You Begin

Endura is a network system that requires a continuous amount of bandwidth to transmit true, live video. Therefore, always include your network administrator when planning and installing Endura components.

You will also need the following items:

Pelco-approved Endura certification

Access to an Endura network

that is an active, Gigabit Ethernet network that supports the full Internet Protocol suite,

that is configured with at least one Endura system manager, and

that is configured with at least one Endura workstation.

NOTES:

Endura components are designed to deliver high-quality, high-frame rate video across a network. For best results, make sure your installation meets the power, environmental, and networking guidelines described in the Endura Installation Guidelines and Best Practices document (C2670M).

When using one or more network switches on the Endura network, enable autonegotiation on all switches.

These network requirements represent the minimum standard for a small Endura-capable security network. Please consult the Endura Network Design Guide (C1640M) to make sure your network is properly configured. Your system may be different and may require additional hardware, software, and network resources.

PARTS LIST

Qty Description

1NVR5100 Series network video recorder

1Hard drive pack:

Six-drive (1.5 TB/3.0 TB) models:

6 Filled hard drive carriers, numbered Drive 1 through Drive 6

6 Empty hard drive carriers, numbered Drive 7 through Drive 12 Twelve-drive (6.0 TB/9.0 TB) models:

12Filled hard drive carriers, numbered Drive 1 through Drive 12

1Accessory pack:

5 Rubber feet with 8-32 x 0.375-inch, Phillips pan head screws (for desktop mounting, installed)

6 Power cords (2 USA standard, 2 European standard, and 2 UK standard)

2 Front bezel keys

1 Disposable wrist strap for electrostatic discharge (ESD) protection

1Rack mount kit (included with accessory pack):

2 Chassis mounting brackets with handles and thumbscrews (installed)

12Screws, 10-32 x 0.25-inch, Phillips pan head (six for each bracket, installed)

2Adjustable support rail sets (each set includes one front-mounting rail and one rear-mounting rail)

8 Screws, 8-32 x 0.375-inch, Phillips truss head (four for each support rail)

8 Screws, 10-32 x 0.5-inch, Phillips flat head (two for each front rail, two for each rack rail spacer)

4 Screws, 10-32 x 0.75-inch, Phillips pan head (two for each rear rail)

2Rack rail spacers

14 Cage nuts, 10-32

3Product serial number labels (attached to unit)

1 NVR5100 Series Installation manual

1 Safety instructions

3Hard drive inserts

8

C1621M-E (9/08)

Page 8
Image 8
Pelco C1621M-E (9/08) 3 manual Before You Begin, Parts List, Qty Description