Perle 833IS User Guide 11
Chapter 2: Site PreparationAbout Site Preparation
In this chapter you will read about:
■Site Preparation Overview
■Electrical Requirements
■Environmental Requirements
■Cabling Planning and Requirements
■Telephony Cabling
Site Preparation Overview
The following is a checklist of recommended tasks that should be completed before
installing the 833IS. Some may not apply to your installation, or you may wish to
add new items.
Identify and contact the following individuals:
✎__ Network supplier.
✎__ Remote Installation Planner.
✎__ Cabling supplier.
then,
✎__ Analyze the site's electrical requirements. See “Electrical Requirements”
on page 12.
✎__ Analyze the site's environmental requirements. See “Environmental
Requirements” on page 13.
✎__ Determine the future location of the 833IS that will meet the placement
needs of the unit. See “Placement” on page 13.
Determine your cabling needs for:
✎__ LAN cabling. See “LAN Cabling” on page 14.
✎__ Telephone network cabling. See “Telephony Cabling” on page 19.