![](/images/backgrounds/135007/bg11a.png)
- 274 -
FIG D-4 VLAN 300 MEMBER PORT
5. On the PVID settings, configure port 1 and port 2’s PVID to 100, port 3 to port 5’s PVID to 200 and
port 6 to port 7’s PVID to 300.
After making above configuration and save them, both workgroup can connect to port 1 and port 2 but
can not connect each other.