Setting Up the A3 System

63

Powering On the A3 System

The individual components of the A3 System should be powered on in the following order:

Power on all Media Libraries

Power on all Cache Expansion Arrays

Power on the Archive Engine

Powering On the Media Library

To ensure proper initialization, always power on the Media Libraries prior to powering on the Archive Engine. To power on a library, press the power button located on the lower left front corner of the library. To power off the library, press the power button again.

Power

Button

Media Library Power Button

Powering On the Cache Expansion Array

If you have installed one or more optional Cache Expansion Arrays, you need to connect it to a power source and switch the system on before starting the Archive Engine.

There are two power supplies in the Cache Expansion Array. It is important to connect both AC receptacles on the power supplies. It is recommended that each of the power supplies be attached to a separate UPS with built in surge protection and line conditioning.

Power on the Cache Expansion Array(s) by pressing the black power switch on the back of the chassis.

Active Archive Appliance (A3) v6.5

PowerFile Confidential

Racking and Installation Guide

Page 71
Image 71
PowerFile manual Powering On the A3 System, Powering On the Media Library, Powering On the Cache Expansion Array