Installation

Serial

Port

Air

Exhausts

Power Output Receptacles

UPS Cabinet

Breaker

 

Input Connector

 

 

 

 

 

 

Battery

Circuit Breaker

Breaker Tie

 

 

 

Battery Cabinet

External Battery Connector

Battery Output

Battery Cable

Battery Input Connector

 

Connector

 

 

Figure 4. Typical UPS Rear Panel

UPS Startup for 120V Models

To start up the UPS for 120V models:

1.Plug the UPS power supply cord into the input connector on the UPS rear panel.

2.Plug the other end of the power supply cord into a grounded, three-wire, AC receptacle that has been wired in accordance with NEC specifications.

The UPS performs diagnostic tests and enters Normal mode with the equipment (load) offline. The indicator remains lit. The startup should take about 15 seconds.

Powerware® 9 Prestige Series User’s Guide (600 VA - 1800 VA) : www.powerware.com

31