INSTALLATION INFORMATION
TERMINAL TB1
MODULE OUTPUT BREAKER 1 (MOB 1)
MODULE OUTPUT
BREAKER 2 (MOB 2)
NEUTRAL
AC OUTPUT TO CRITICAL LOAD WITHOUT SLB (A, B, C)
(SEE SHEET 31 of 34
FOR DETAILS)
AC INPUT FROM UPM 2 (A, B, C)
(SEE SHEET 31 of 34
FOR DETAILS)
GROUND
40/20, 40/30, 40/40 KVA, 208/208V
PARALLEL REDUNDANT CONFIGURATION
NOTE Metal shields covering wiring terminals must be removed to access terminals.
DESCRIPTION: | POWER TERMINAL LOCATIONS | ||
|
|
|
|
DRAWING NO: |
|
| SHEET: 13 of 34 |
REVISION: | E | DATE: 092107 |
EATON Powerware® 9390 UPS Sidecar Installation and Operation Manual S 164201586 Rev E www.powerware.com |