Powerware Powerware 9390 manual Installing Standalone Parallel Redundant Power Wiring

Models: Powerware 9390

1 124
Download 124 pages 14.91 Kb
Page 25
Image 25

INSTALLING THE UPS SIDECAR

2.4.4Installing Standalone Parallel Redundant Power Wiring

NOTE Remove the UPS Sidecar top or bottom conduit landing plate to drill or punch conduit holes, or remove knockouts (see Drawing 164201546-5 starting on page A-27).

NOTE Refer to the applicable Powerware 9390 installation and operation manual, listed in paragraph 1.5, for UPS cabinet wiring information and conduit and terminal locations.

C A U T I O N

Specified wiring and the MOB and SLB breakers for the UPS Sidecar are rated for parallel redundant service only. DO NOT use as a parallel capacity system.

C A U T I O N

Parallel system wiring length should be in accordance with the parallel drawings found in the appendix of the applicable Powerware 9390 installation and operation manual, listed in paragraph 1.5. Correct wire length ensures approximate equal current sharing when in Static Bypass mode.

1.Verify the UPS system is turned off and all power sources are removed. Refer to the applicable Powerware 9390 installation and operation manual, listed in paragraph 1.5, for shutdown instructions.

2.If not already removed, remove the screw securing the bottom of the UPS Sidecar front panel (see Figure 2-1 on page 2-3). Lift up the panel and remove.

3.If not already removed, remove the screws securing the internal safety shield panel and remove the panel to gain access to the terminals.

4.Route and connect output cables from UPM 2 to MOB 2 in the UPM 1 UPS Sidecar. See Drawing 164201546-6, starting on page A-30, for UPS Sidecar wiring access information and terminal locations.

5.Connect phase A, B, and C, and Neutral power wiring from UPM 2 to MOB 2.

6.Route the output cables to the UPS Sidecar output terminals. See Drawing 164201546-6, starting on page A-30, for UPS Sidecar wiring access information and terminal locations.

7.Connect phase A, B, and C, and Neutral power wiring from the UPS Sidecar output terminals to the critical load.

8.After wiring the UPS system to the facility power and critical load, be sure to ground the system according to local and/or national electrical wiring codes.

9.If wiring interface connections, proceed to paragraph 2.4.5; otherwise, proceed to Step 10.

10.When all wiring is complete, reinstall the internal safety shield panels removed in previous steps.

11.Reinstall the UPS Sidecar front panel and secure with the screw at the bottom of the panel.

EATON Powerware® 9390 UPS Sidecar Installation and Operation Manual S 164201586 Rev E www.powerware.com

2-9

Page 25
Image 25
Powerware Powerware 9390 manual Installing Standalone Parallel Redundant Power Wiring