Manual background

Repeat for all four andirons as shown (see Figure 44).

Figure 44.

The electric ember bed must be prepared before the logs are set up (see Figure 45).

Figure 45.

Start by applying the teco-sil (granulated glass) to the base pan (see Figure 46).

Figure 46.

Pile a thin layer and follow the pattern on the base pan (see Figure 47).

Figure 47.

Now the Lava rock can be applied (see Figure 48).

Figure 48.

The lava rock should cover the remaining base pan area (see Figure 49). Do not put lava rock on top of the glass (teco-sil).

Figure 49.

Quadra-FireQV-PIER, QV-ST Series: HV-IPI2005-901 Rev. G • 2/06