Raypak 0066B Contents, Warnings, Vent Damper Wiring Diagram, Sequence Of Operation, Warranty

Models: 0042B 0180B 0066B

1 40
Download 40 pages 10.3 Kb
Page 3
Image 3
CONTENTS

CONTENTS

WARNINGS

Pay Attention to These Terms

RECEIVING EQUIPMENT GENERAL SPECIFICATIONS INSTALLATION

Code Requirements

Mounting Base

Clearance Requirements

Combustion/Ventilation Air

Venting Connections

Vent Damper Installation Location

VENT DAMPER WIRING DIAGRAM

Gas Supply Connections

Gas Pressure

Water Connections & System Piping Electrical Wiring

WIRING DIAGRAMS SERVICING PROCEDURES General Location of Controls

SEQUENCE OF OPERATION

Intermittent Ignition Device (IID)

START-UP PROCEDURES

Lighting the Boiler

For Standing Pilot Models

Filling the System

Checking the Circulator

For Standing Pilot Models with Robertshaw Gas Valve, 2-stage Operation (Models 90, 13 & 180) To Turn Off Gas to the Boiler (Models 90, 135 & 180)

For Automatic Ignition Models For Intermittent Ignition (IID) with Honeywell or Robertshaw Gas Valve (All Models)

To Turn Off Gas to the Boiler Shut-down Procedure

Testing the Ignition afety Shut-off Safe Shut-down Tests Inspection Procedures

REPAIR PROCEDURES

Tube Cleaning Procedure

Heat Exchanger Removal

4

4

5

5

7

7

7

7

8

9

11

14

15

15

15

18

19

26

26

26

26

27

27

27

27

27

28

28

28

29

29

29

30

30

31

32

32

32

Heat Exchanger Re-assembly Combustion Chamber Removal

TROUBLESHOOTING

Adjustment & Replacement of

Components

Replacement Parts

WARRANTY

33

33

34

36

37

38

3

Page 3
Image 3
Raypak 0066B Contents, Warnings, Vent Damper Wiring Diagram, Sequence Of Operation, Start-Upprocedures, Repair Procedures