Manuals
/
Raypak
/
Household Appliance
/
Boiler
Raypak
operating instructions Wiring Diagrams Models 1005
Models:
1005
1
42
60
60
Download
60 pages
9.32 Kb
39
40
41
42
43
44
45
46
<
>
Troubleshooting
Install
Wiring Diagrams Models 1005
Maintenance
Venting Configurations
Field Wiring Connection
High Limit-Manual Reset
UDB Diagnostic Board
PVC vent assembly instructions
Modes Default Setting Range
Page 42
Image 42
WIRING DIAGRAMS -
Models 1005 & 1505
42
Page 41
Page 43
Page 42
Image 42
Page 41
Page 43
Contents
Installation & Operating Instructions
Page
Contents
Pay Attention to These Terms
Product Receipt
Before Installation
Installations at Elevation
Model Identification
Gas Vent Size Conn Input
Component Locations
General Information
Max Min
General Safety
Time/Temperature Relationships in Scalds
Water Time to Produce Serious Temp Burn
Indoor Installations
Installation
Installation Codes
Equipment Base
Indoor Units
Outdoor Installations
Combustion and Ventilation Air
Heater Min. Clearance Minimum From Combustible
Table E Vent/Air Inlet Termination Clearances
Combustion Air Filter
Direct Vent
TruSeal Combustion Air
Remove the Debris Screen
Conventional Combustion Air Supply
Installations
Canadian Installations
All Air from Inside the Building
Water Piping
Relief Valve Installation and Piping
Temperature & Pressure Gauge
General
Hydronic Heating
Domestic Hot Water
Fitting Type Equivalent Length ft 2 NPT
Combined Potable Water and Space Heating
Pool Heating
Automatic Chlorinators and Chemical Feeders
Pool/Spa Water Chemistry
Winterizing Your Heater
Gas Supply
Gas Supply Connection
Water Hardness
Electrical Power Connections
Gas Supply Pressure
Check the Power Source
Making the Electrical Connections
Field Wiring Connection
Support of Vent Stack
Appliance Categories
Installations
Vent Terminal Location
Canadian Installations
Venting Installation Tips
Venting Configurations
Installation
Length
Certified
Total Effective Combustion Air Air Inlet
Max. Length* ft
Model Vent Size Volume Flue Products
Common Venting
Horizontal Through-the-Wall and Direct Venting Category
Horizontal Through-the-Wall Venting
Direct Vent-Vertical
Direct Vent Vertical
Outdoor Installation
Outdoor Venting
Freeze Protection
Cleaning
PVC vent assembly instructions
PVC Venting Option
PVC Vent Adapter
Termination using Adapter Thimble
Controls
Operating Modes
Differential Graph
Boil Target 78F Boil Max 86F Boil Min 70F ‘Burner’ Delay
Modes Default Setting Range
10 VDC 20 mA
10 VDC 20 mA Boiler Target
Definitions
Number Field Type Fault Description
Operation
Rank
Heater Sequence of Operation
Ignition Module
Flow Switch
High Limit-Manual Reset
High Limit-Auto Reset Optional
Code Condition
Modulating Temperature Control
High & Low Gas Pressure Switches Optional
Low Water Cut-Off Optional
Blocked Vent Switch
Air Pressure Switch
UDB Diagnostic Board
Condensate Float Switch
Wiring Diagrams Models 1005
Model
START-UP
Pre Start-up
Pre Start-up Check
Start-Up
Initial Start-up
Preparation
Required tools
Blower Check
Model No Net Blower Suction Setting In. WC
Model No Amp Draw Setting
Manifold Check
Finishing
Safety Inspection
Leak Test Procedure Dual-Seat Gas Valve
Follow-Up
Post Start-Up Check
GAS
Operation
Lighting Instructions
To Turn Off Gas To Appliance
Troubleshooting
Step
Maintenance
UDB Fault History
Suggested Minimum Maintenance Schedule
Weekly
Preventive Maintenance Schedule
Periodically
Semi-Annually
Appendix
Inside Air Contamination
As Required
Important Instructions for the Commonwealth of Massachusetts
Limited Parts Warranty Xtherm Types H and WH
Models
Limited Parts Warranty Xtherm Types WHP
START-UP Checklist for FAN-ASSISTED Raypak Products
Page