Manuals
/
Raypak
/
Household Appliance
/
Boiler
Raypak
1005 operating instructions Model
Models:
1005
1
43
60
60
Download
60 pages
9.32 Kb
40
41
42
43
44
45
46
47
<
>
Troubleshooting
Install
Wiring Diagrams Models 1005
Maintenance
Venting Configurations
Field Wiring Connection
High Limit-Manual Reset
UDB Diagnostic Board
PVC vent assembly instructions
Modes Default Setting Range
Page 43
Image 43
Model 2005
43
Page 42
Page 44
Page 43
Image 43
Page 42
Page 44
Contents
Installation & Operating Instructions
Page
Contents
Pay Attention to These Terms
Model Identification
Before Installation
Installations at Elevation
Product Receipt
Max Min
Component Locations
General Information
Gas Vent Size Conn Input
Time/Temperature Relationships in Scalds
General Safety
Water Time to Produce Serious Temp Burn
Equipment Base
Installation
Installation Codes
Indoor Installations
Heater Min. Clearance Minimum From Combustible
Outdoor Installations
Combustion and Ventilation Air
Indoor Units
Table E Vent/Air Inlet Termination Clearances
Direct Vent
Combustion Air Filter
Remove the Debris Screen
TruSeal Combustion Air
All Air from Inside the Building
Installations
Canadian Installations
Conventional Combustion Air Supply
General
Relief Valve Installation and Piping
Temperature & Pressure Gauge
Water Piping
Hydronic Heating
Fitting Type Equivalent Length ft 2 NPT
Domestic Hot Water
Pool Heating
Combined Potable Water and Space Heating
Automatic Chlorinators and Chemical Feeders
Winterizing Your Heater
Pool/Spa Water Chemistry
Gas Supply Connection
Gas Supply
Water Hardness
Gas Supply Pressure
Electrical Power Connections
Making the Electrical Connections
Check the Power Source
Support of Vent Stack
Field Wiring Connection
Appliance Categories
Vent Terminal Location
Installations
Installation
Venting Installation Tips
Venting Configurations
Canadian Installations
Max. Length* ft
Certified
Total Effective Combustion Air Air Inlet
Length
Common Venting
Model Vent Size Volume Flue Products
Horizontal Through-the-Wall Venting
Horizontal Through-the-Wall and Direct Venting Category
Direct Vent Vertical
Direct Vent-Vertical
Outdoor Venting
Outdoor Installation
PVC Venting Option
Cleaning
PVC vent assembly instructions
Freeze Protection
PVC Vent Adapter
Controls
Termination using Adapter Thimble
Differential Graph
Operating Modes
Boil Target 78F Boil Max 86F Boil Min 70F ‘Burner’ Delay
10 VDC 20 mA
Modes Default Setting Range
10 VDC 20 mA Boiler Target
Definitions
Operation
Number Field Type Fault Description
Rank
Ignition Module
Heater Sequence of Operation
Code Condition
High Limit-Manual Reset
High Limit-Auto Reset Optional
Flow Switch
High & Low Gas Pressure Switches Optional
Modulating Temperature Control
Low Water Cut-Off Optional
Condensate Float Switch
Air Pressure Switch
UDB Diagnostic Board
Blocked Vent Switch
Wiring Diagrams Models 1005
Model
Pre Start-up
START-UP
Pre Start-up Check
Required tools
Initial Start-up
Preparation
Start-Up
Manifold Check
Model No Net Blower Suction Setting In. WC
Model No Amp Draw Setting
Blower Check
Follow-Up
Safety Inspection
Leak Test Procedure Dual-Seat Gas Valve
Finishing
GAS
Post Start-Up Check
Lighting Instructions
Operation
To Turn Off Gas To Appliance
Step
Troubleshooting
UDB Fault History
Maintenance
Suggested Minimum Maintenance Schedule
Semi-Annually
Preventive Maintenance Schedule
Periodically
Weekly
Inside Air Contamination
Appendix
As Required
Important Instructions for the Commonwealth of Massachusetts
Models
Limited Parts Warranty Xtherm Types H and WH
Limited Parts Warranty Xtherm Types WHP
START-UP Checklist for FAN-ASSISTED Raypak Products
Page