Installing the water heater:
Vertical Vent Termination Location
Only Rheem approved termination and parts should be used during installation.
Vent Pipe
Through Roof
Min.. 12" (30 cm) Above Roof 1
Min.. 12" (30 cm) Above Anticipated Snow Level..
Max.. 24" (60 cm) Above Roof (Without Additional Support)
1Min.. 18" (46 cm) Above Roof for installations in Canada..
The location of the vent terminal depends on the following minimum clearances and considerations (see diagram at left):
Minimum twelve (12) inches (30 cm) above roof..2
Minimum twelve (12) inches (30 cm) above anticipated snow level..
Maximum
Four (4) feet (1..2 m) from any gable, dormer or other roof structure with building interior access (i..e.., vent, window, etc..)..
Ten (10) feet (3 m) from any forced air inlet to the building.. Any fresh or
2For installations in Canada 18" (45..7 cm)..
3For installations in Canada 6' (1..8 m)..
Notice: Only Rheem approved termination and parts should be used during installation.
Notice: Follow vent manufacturer’s installation instructions and their recommended clearances to combustibles as required.
Vertical Vent Installation
A fire stop plate should be installed at every penetration of a floor or ceiling if the vent is not running in a
Once the vent terminal location has been determined, make a hole through the roof and interior ceiling to accommodate the vent pipe.. Complete the vent pipe installation to the water heater’s vent connector fitting on the water heater vent collar outlet.. Support
vertical or horizontal runs as previously mentioned.. If required, use silicone sealant at the point the vent connector joins the water heater..
Install adequate flashing where the vent pipe passes through the roof.. Determine the vent terminal height and install the vent pipe accordingly.. Refer to the diagram above for proper vent terminal height..
The vent roof system must terminate at least
1 foot (30 cm) above the roof line and at least 2 feet (61 cm) higher than any portion of the
| Vertical |
| Termination |
Storm | Adapter |
| |
Collar | Air Intake |
|
| Adjustable |
Roof Jack | Roof |
Flashing | |
3“/ 5” Concentric Pipe |
|
building within 10 feet (3 m)..
Install supports every 5 feet (1..5 m) vertically along the vent pipe route.. Vertical supports are required after every transition to vertical and are required after every offset elbow.. When the vent is
Support
Clamp
Chase Requires
6" (15 cm) Clearance
to Combustibles
1/4" per foot upward slope
1" (2 .5 cm) Clearance
Firestop
Firestop
be used at a second location..
Follow the vent manufacturer’s recommended installation instructions provided with the vent purchased from the manufacturer..
2' | Support |
Hanger | |
(61 cm) | Condensate |
Max | Trap |
| To Drain . Dispose of |
Vent | condensate in accordance |
to local codes | |
Adapter |
Detail of condensate trap..
|
|
|
|
|
14 | Standard Vertical Vent Termination | |||
|
|
|
|