Installing the water heater:

Vertical Vent Termination Location

Only Rheem approved termination and parts should be used during installation.

Vent Pipe

Through Roof

Min.. 12" (30 cm) Above Roof 1

Min.. 12" (30 cm) Above Anticipated Snow Level..

Max.. 24" (60 cm) Above Roof (Without Additional Support)

1Min.. 18" (46 cm) Above Roof for installations in Canada..

The location of the vent terminal depends on the following minimum clearances and considerations (see diagram at left):

Minimum twelve (12) inches (30 cm) above roof..2

Minimum twelve (12) inches (30 cm) above anticipated snow level..

Maximum twenty-four (24) inches (60 cm) above roof level without additional support for vent..

Four (4) feet (1..2 m) from any gable, dormer or other roof structure with building interior access (i..e.., vent, window, etc..)..

Ten (10) feet (3 m) from any forced air inlet to the building.. Any fresh or make-up air inlet such as a dryer or furnace area is considered to be a forced air inlet..3

2For installations in Canada 18" (45..7 cm)..

3For installations in Canada 6' (1..8 m)..

Notice: Only Rheem approved termination and parts should be used during installation.

Notice: Follow vent manufacturer’s installation instructions and their recommended clearances to combustibles as required.

Vertical Vent Installation

A fire stop plate should be installed at every penetration of a floor or ceiling if the vent is not running in a fire-rated shaft.. Maintain the recommended air space clearance to combustible materials and building insulation..

Once the vent terminal location has been determined, make a hole through the roof and interior ceiling to accommodate the vent pipe.. Complete the vent pipe installation to the water heater’s vent connector fitting on the water heater vent collar outlet.. Support

vertical or horizontal runs as previously mentioned.. If required, use silicone sealant at the point the vent connector joins the water heater..

Install adequate flashing where the vent pipe passes through the roof.. Determine the vent terminal height and install the vent pipe accordingly.. Refer to the diagram above for proper vent terminal height..

The vent roof system must terminate at least

1 foot (30 cm) above the roof line and at least 2 feet (61 cm) higher than any portion of the

 

Vertical

 

Termination

Storm

Adapter

 

Collar

Air Intake

 

 

Adjustable

Roof Jack

Roof

Flashing

3“/ 5” Concentric Pipe

 

building within 10 feet (3 m)..

Install supports every 5 feet (1..5 m) vertically along the vent pipe route.. Vertical supports are required after every transition to vertical and are required after every offset elbow.. When the vent is free-standing and penetrates a roof/ceiling, another means of support must

Support

Clamp

Chase Requires

6" (15 cm) Clearance

to Combustibles

1/4" per foot upward slope

1" (2 .5 cm) Clearance

Firestop

Firestop

be used at a second location..

Follow the vent manufacturer’s recommended installation instructions provided with the vent purchased from the manufacturer..

2'

Support

Hanger

(61 cm)

Condensate

Max

Trap

 

To Drain . Dispose of

Vent

condensate in accordance

to local codes

Adapter

Detail of condensate trap..

 

 

 

 

 

14

Standard Vertical Vent Termination

 

 

 

 

Page 14
Image 14
Rheem ECO-180DV, P), PH-25RDVS, RUTG-66DV, RMTG-66DV warranty Vertical Vent Termination Location, Vertical Vent Installation