5. Check rubber seal is in place on terminal.
*For weather board walls, add spare rubber seal | Terminal seal | |
provided to compensate for weather board angle. | (Add "weather board" | |
seal here) | ||
|
6. Installation of Terminal
"TOP" mark "A"
From outside, insert terminal into sleeve with the “A”
Label
mark at the top. Left hand side fixing tie is marked “LEFT” (from inside).
Fixing tie
Terminal
7. Attached Ties
Cut (leave 20mm free)
Pull hard on left and right hand side ties, clip ties over |
|
lugs inside sleeve. You should be able to pull ties 2 or |
|
3 slots past the starting point. Cut the ties, leaving | Pull hard |
about 3/4" (20mm) past the lugs. Bend ties so they |
|
are parallel with the wall. | Fixing tie |
|
LugTerminal
Sleeve
8. Insert Inner Connection Assembly. |
| |
Push assembly into the terminal tube, make sure | Top Mark | |
Screw | ||
“TOP” mark is uppermost. Fix with 3 screws provided. | ||
| ||
| lnner | |
| Connections |
9. Manifold can still be turned after attaching.
Outlet
Rubber cap
Inlet
– 21 –