Rinnai RHFE-431FA installation manual Check rubber seal is in place on terminal

Models: RHFE-431FA

1 60
Download 60 pages 14.62 Kb
Page 23
Image 23
5. Check rubber seal is in place on terminal.

5. Check rubber seal is in place on terminal.

*For weather board walls, add spare rubber seal

Terminal seal

provided to compensate for weather board angle.

(Add "weather board"

seal here)

 

6. Installation of Terminal

"TOP" mark "A"

From outside, insert terminal into sleeve with the “A”

Label

mark at the top. Left hand side fixing tie is marked “LEFT” (from inside).

Fixing tie

Terminal

7. Attached Ties

Cut (leave 20mm free)

Pull hard on left and right hand side ties, clip ties over

 

lugs inside sleeve. You should be able to pull ties 2 or

 

3 slots past the starting point. Cut the ties, leaving

Pull hard

about 3/4" (20mm) past the lugs. Bend ties so they

 

are parallel with the wall.

Fixing tie

 

LugTerminal

Sleeve

8. Insert Inner Connection Assembly.

 

Push assembly into the terminal tube, make sure

Top Mark

Screw

“TOP” mark is uppermost. Fix with 3 screws provided.

 

 

lnner

 

Connections

9. Manifold can still be turned after attaching.

Outlet

Rubber cap

Inlet

– 21 –

Page 23
Image 23
Rinnai RHFE-431FA installation manual Check rubber seal is in place on terminal