ROBERTS GOR DON® BH-SERI E S SUBM IT TAL SHE E T

HEATER INSTALLATION

Critical Hanger Placement

Typical Suspension Details

Beam Clamp

24" min.*

Rod (3/8")

 

(61 cm)

“X”*

 

Anchor

Screw Hook (3/8")

Chain size

3/16" minimum

“S” Hooks

Concrete Beam Locknut Wood Beam

Washers

Turnbuckle

* Allows for thermal expansion of system

Not Included

S Hooks

 

 

Side View

 

Hanger

Hanger

 

 

Reflector

 

 

Must Be Within 4" (10 cm)

Front View

45° Angle

Description

Part Number

S-Hook

91907302

Tube/Reflector Hanger

03090100

Run Length

Typical Expansion

Mininum “X” Length

10’ - 50’

±1” (3 cm)

12”

51’ - 60’

±2” (5 cm)

18”

61’ - 80’

±3” (8 cm)

24”

© 2004 Roberts-GordonBEFORE IN STALLATI ON AND OPER ATI ON OF HEATI NG EQUIPMENT, READ AND U NDERSTAND THE INSTALLATION, OPERATIO N AND SERVICE MANUAL .

APPLICATION S, ENGI NEERING AND DETAI LED GUID ANCE ON SYSTEMS DESIGN, INSTALLATI ON AND PRODUCT PERFORMANCE IS AVAI LABLE UPON REQUEST. ROBERTS GORDON® PRODUCTS ARE TO BE INSTALLED ONLY IN ACCORDANCE WI TH LOCAL LAWS, CODES AND REGULATIONS, AND ONLY BY A CONTRACTOR QUALI FIED I N THE I NSTALLATION AND SERVICE OF GAS-FIRED HEATING EQUI PMENT.

Page 11
Image 11
Roberts Gorden BH Series service manual Heater Installation, Critical Hanger Placement