ROBERTS GORDON ® BH-SERI E S SUBM IT TAL SHE E T

 

 

 

 

 

BH-Series U-Tube Layout Overviews

 

 

 

 

 

 

LEGEND

 

 

bc

 

 

 

 

g

e

 

 

 

 

 

 

 

 

Burner

 

 

 

 

 

 

Reflector

BH-60

h

 

 

 

 

 

BH-80

 

 

 

 

 

 

 

 

 

 

Tube 10'

 

 

20' Tube Length*

 

 

 

Tube 5' **

 

 

 

 

 

 

Tube/Reflector

 

 

bc

 

 

 

Hanger

 

 

 

 

 

Coupling

 

g

d

f

 

 

 

 

 

 

 

 

Assembly

 

 

 

 

 

 

U-Tube

 

 

 

 

 

 

Vent Adapter

BH-80

h

 

 

 

 

BH-100

 

 

 

 

(not shown)

 

 

 

a =

14" (36 cm)

BH-115

 

30' Tube Length**

 

 

 

 

 

 

reflector width (not shown)

 

 

 

 

 

b =

2" (5 cm)

 

 

b

 

 

end cap to burner

 

 

 

 

 

 

 

 

c

 

 

c =

2" (5 cm)

 

g

d

e

 

end cap to hanger

 

 

 

 

 

d =

7'6" (229 cm)

BH-100

 

 

 

 

distance first hanger

 

 

 

 

e =

10' (305 cm)

BH-115

h

 

 

 

BH-125

 

 

 

distance between hangers

BH-140

 

40' Tube Length

 

 

f = 5' (153 cm)

 

 

 

 

 

 

 

 

 

distance between last full tube

 

 

 

 

 

hanger and half tube hanger

 

 

 

 

 

g =

12.5" (32 cm) burner length

 

 

bc

 

 

h =

11" (28 cm) burner height

 

 

 

 

 

g

d

e

f

 

 

 

* Require the last reflector

BH-115

 

 

 

 

before the U-Tube to be cut in

 

 

 

 

half for use on both sides.

BH-125

 

 

 

 

** Require the last tube before

BH-140

h

 

 

 

BH-150

 

 

 

the U-Tube to be cut in half for

BH-175

 

 

 

 

use on both sides.

 

 

 

 

 

 

50' Tube Length* **

 

 

 

 

 

 

 

 

© 2004 Roberts-Gordon

BEFORE IN STALLATI ON AND OPER ATI ON OF HEATI NG EQUIPMENT, READ AND U NDERSTAND THE INSTALLATION, OPERATIO N AND SERVICE MANUAL .

APPLICATION S, ENGI NEERING AND DETAI LED GUID ANCE ON SYSTEMS DESIGN, INSTALLATI ON AND PRODUCT PERFORMANCE IS AVAI LABLE UPON REQUEST. ROBERTS GORDON® PRODUCTS ARE TO BE

 

INSTALLED ONLY IN ACCORDANCE WI TH LOCAL LAWS, CODES AND REGULATIONS, AND ONLY BY A CONTRACTOR QUALI FIED I N THE I NSTALLATION AND SERVICE OF GAS-FIRED HEATING EQUI PMENT.

Page 20
Image 20
Roberts Gorden BH Series service manual BH-Series U-Tube Layout Overviews