FIGURE 12: Critical Hanger Placement
Typical Suspension Details
Beam Clamp
| Rod (3/8") |
24" min.* (9.5 mm) | |
(61 cm) | “X”* |
|
Anchor
Screw Hook (3/8") (9.5 mm)
Chain size 3/16" (4.7 mm)
minimum
“S” Hooks
Concrete Beam Locknut Wood Beam
Washers
Turnbuckle | * Allows for thermal expansion of system |
Not Included |
S Hooks |
|
|
|
|
Side View |
|
|
| Hanger |
Hanger |
|
|
|
|
Reflector |
|
|
|
|
Must Be Within 4" (10 cm) | Front View |
| 45° Angle | |
Total Straight Length (both sides) or Length from | Typical Expansion | Minimum “X” Length | ||
in a Double "U" Layout |
| Each Side |
| |
|
|
| ||
0’ - 50’ |
| ±1” (3 cm) |
| 12” (31 cm) |
51’ - 60’ |
| ±2” (5 cm) |
| 18” (46 cm) |
61’ - 80’ |
| ±3” (8 cm) |
| 24” (61 cm) |
81’ - 100’ |
| ±4” (10 cm) |
| 30" (76 cm) |
101’ - 120’ |
| ±5” (13 cm) |
| 36" (91 cm) |
121’ - 140’ |
| ±6” (15 cm) |
| 42" (107 cm) |
141’ - 160’ |
| ±7” (18 cm) |
| 48" (122 cm) |
If the installation requires a shorter suspension length than the minimum listed, the suspension length may be reduced by 6" (16 cm). In this case, tube clamps MUST be used at the two farthest hangers on each side of the burner. See Page 15, Figure 13.
Description | Part Number |
91907302 | |
Tube/Reflector Hanger | 03090100 |
14