Roberts Gorden TF-200, TF-350, TF-300, TF-120 1 Burner Tube Installation, 2 Burner Installation

Models: TF-380 TF-250 TF-160 TF-200 TF-120 TF-300 TF-350

1 28
Download 28 pages 5.15 Kb
Page 24
Image 24
Step 7.1 Burner Tube Installation

TF-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

Step 7.1 Burner Tube Installation

NOTE:

Tubing requires a downward slope of 1/2" (13 mm)

per 20' (6 m) away from burner.

7' 6" ± 1'

(229 cm ± 25 cm)

S Hook

29"± 2"

(73 cm ± 5 cm)

Description

Part Number

Burner Tube

Burner Tube

03051XXX

Hanger

S-Hook

91907302

 

Tube/Reflector Hanger

03090100

 

Offset mounting hole must be to the top

Weld Seam must be to the bottom of the tube.

Step 7.2 Burner Installation

 

Bolt

 

Lock Washer

 

Gasket

 

Burner

Description

Part Number

Bolt

94273914

Lock Washer

96411600

Gasket

02568200

Burner

090XXXXX

18

 

Page 24
Image 24
Roberts Gorden TF-200, TF-350, TF-300, TF-120, TF-160, TF-250, TF-380 1 Burner Tube Installation, 2 Burner Installation