2 Basic Operation

2-4 Loading the Material

Roll material must be placed at a predetermined shaft position.

Failure to do so may result in falling of the roll, leading to injury.

Loading Roll Material

Acceptable material widths

FJ-50

210 mm to 1350 mm (8-5/16" to 53-1/8")

FJ-40

210 mm to 1125 mm (8-5/16" to 44-1/4")

Rear

1

Secure the retainer on the left-hand side in place at the

 

 

 

 

 

 

 

 

 

location shown in the figure.

 

 

 

 

 

 

 

 

 

 

Tighten the screw to secure in place.

 

Left-hand retainer

 

 

 

 

 

 

 

 

* When using roll material, the retainer on the left-

 

 

 

 

 

 

 

 

 

 

hand side should always be used secured in

 

 

 

 

 

 

 

 

 

 

place at the location shown in the figure.

 

 

 

 

 

 

 

 

 

 

 

 

100 mm (3-15/16")

 

 

2

Line up with the core diameter of the loaded roll material and refit

 

 

 

 

 

 

 

 

 

the left- and right-hand media flanges.

 

 

 

 

 

 

 

 

 

 

 

Media flange

 

 

 

 

 

 

 

 

 

Flange retaining pin

Media flange

 

 

 

 

 

 

50.8 mm

 

 

 

 

 

76.2 mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(2")

 

 

 

 

 

(3")

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(2)

(1)

Line up the ridges and grooves.

(3)

(4)

19