2 Basic Operation

2-4 Loading the Material

Roll material must be placed at a predetermined shaft position.

Failure to do so may result in falling of the roll, leading to injury.

Loading Roll Material

Acceptable material widths

FJ-52

210 mm to 1350 mm (8-5/16 in. to 53-1/8 in.)

FJ-42

210 mm to 1125 mm (8-5/16 in. to 44-1/4 in.)

Rear

Secure the retainer on the left-hand side in place at the

1 location shown in the figure. Tighten the screw to secure in place.

Left-hand retainer

*When using roll material, the retainer on the left- hand side should always be used secured in place at the location shown in the figure.

100 mm (3-15/16 in.)

2

Line up with the core diameter of the loaded roll material and refit

 

 

 

 

 

 

 

 

 

 

the left- and right-hand media flanges.

 

 

 

 

 

 

 

 

 

 

 

 

Media flange

 

 

 

 

 

 

 

 

 

Flange retaining pin

Media flange

 

 

 

 

 

 

50.8 mm

 

 

 

 

 

 

76.2 mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(2 in.)

 

 

 

 

 

 

(3 in.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(2)

(1)

Line up the ridges and grooves.

(3)

(4)

19