COMPLETING THE INSTALLATION
Performing Leak Tests
C D
B |
A |
Before completing the installation (insulation of the cables, hose and piping and fixing of the indoor unit to the installation plate), you must check that there are no gas leaks.
To check for gas leaks on the... | Then, using a leak detector, |
| check the... |
|
|
Indoor unit | Flare nuts at the end of sections |
| C and D. |
|
|
Outdoor unit | Valves on sections A and B. |
|
|