COMPLETING THE INSTALLATION

Performing the Gas Leak Tests

CD

A

B

Make sure to check for gas leaks before completing the installation process (connecting the assembly pipe and hose between indoor unit and outdoor unit, insulating the cables, hose and pipe, and fixing the indoor unit to the installation plate).

To check for gas leaks on the...

Using a leak detector, check the...

 

 

Indoor unit

Flare nuts C and D.

 

 

Outdoor unit

Valves A and B.

 

 

LEAK TEST WITH NITROGEN (before opening valves)

In order to detect basic refrigerant leaks, before recreating the vacuum and recirculating the R410A, it’s responsible of installer to pressurize the whole system with nitrogen (using a cylinder with pressure reducer) at a pressure above 40 bar (gauge).

LEAK TEST WITH R410A (after opening valves)

Before opening valves, discharge all the nitrogen from the system and create vacuum according to page 18.

After opening valves, check leaks using a leak detector for refrigerant.

PUMP DOWN (before disconnecting the refrigerant connections for unit repair, removal or disposal)

Pump-down is an operation intended to collect all the system refrigerant in the outdoor unit.

This operation must be carried out before disconnecting the refrigerant tubing in order to avoid refrigerant loss to the atmosphere.

-Shut off the liquid valve with the Allen wrench.

-Turn the system on in cooling with fan operating at high velocity. (Compressor will immediately start, provided 3 minutes have elapsed since the last stop).

-After 2 minutes of operation, shut the suction valve with the same wrench.

-Turn the system off and switch mains supply off.

-Disconnect tubing. After disconnection, protect valves and tubing ends from dust.

-Compressor damage may occur if run at a negative suction pressure.

E-20

Vivaldi_IM_30271A_E_11.07.09.indd 20

2009-11-7 13:57:14

Page 20
Image 20
Samsung AQ24UGAN Performing the Gas Leak Tests, To check for gas leaks on, Leak Test with Nitrogen before opening valves