COMPLETING THE INSTALLATION

Final Check and Trial Operation

AQU/R

AQU/R

AQE

AQE

To complete the installation, perform the following checks and tests to ensure that the air conditioner operates correctly.

1Check the followings:

Strength of the installation site

Tightness of pipe connection to detect gas leak

Electric wiring connection

Heat-resistant insulation of the pipe

Drainage

Grounding conductor connection

Correct operation (follow the steps below)

2Press the button and check the following:

The indicator on the indoor unit lights up.

The airflow blade opens and the fan gears up for operation.

3Press the button to select Cool or Heat mode.

InCool mode, use Temp or button and set the temperature at 16°C.

InHeat mode, use Temp or button and set the temperature at 30°C.

Note Approximately 3~5 minutes later, outdoor unit will start to operate and the Cool or Warm air will blow out.

 After 12 minutes of stationary condition check the indoor unit air treatment:

Cooling mode (indoor unit check) --> Inlet air temp. - Outlet air temp: From 10°K to 12°K ( indicative delta T)

Heating mode (indoor unit check) --> Outlet air temp. - Inlet air temp: From 11°K to 14°K (indicative delta T)

In heating mode, the indoor fan motor can remain off to avoid cold air blown into conditioned space.

4Press the button and check the following: The airflow blades work properly.

5Press the button to stop the operation.

E-22

Vivaldi_IM_30271A_E_11.07.09.indd 22

2009-11-7 13:57:18

Page 22
Image 22
Samsung AQ24UGAN, AQ09UGDN manual Final Check and Trial Operation