Chapter 2 ED2250S/P Installation

Before Installing

Checking Package Contents

Please check that all components listed below are included in the

package:

In this chapter, we will check the contents of the package before installing the ED2250S/P, and prepare a power adapter suitable for the power supply system.

(Power Consumption: 18W; Voltage: 24VAC, 1.5A)

Then, we will install the ED2250S/P and connect the cables.

ED2250S/P

Bracket anchor

 

Owner’s

Instructions

Screws

Cover Body

Camera Holder

 

E

2-1

2-2

Page 11
Image 11
Samsung manual ED2250S/P Installation Before Installing, Checking Package Contents