Seiko BX-900 owner manual Power-on operation summary, Operation reference

Models: BX-900

1 146
Download 146 pages 27.38 Kb
Page 31
Image 31

3. Control panel and operations

Power-on operation summary

Operation (reference page)

Self test, draft (P21)

Self test,LQ (P21)

Hex dump, draft (P62)

Hex dump,LQ (P62)

Extended setup options (P33)

Demo printout (P22)

Loading MEMO 1 (P31)

Loading MEMO 2 (P31)

Loading MEMO 3 (P31)

Vertical alignment (P66)

EEPROM initialize 1

EEPROM initialize 2

LF

FF

ON LINE

PARK

QUALITY

M. LF

M. RLF

RLF

TEAR OFF

SETUP

ALT

RESET

POWER

Notes

1.Use either the RESET key or power switch when the circle is in both the RESET and POWER columns.

2.EEPROM initialize 2 operation requires the vertical alignment operation after the execution of the EEPROM initialize 2.

23

Page 31
Image 31
Seiko BX-900 owner manual Power-on operation summary, Operation reference