Sharp R-22AT, R-24AT Two Magnetron Operation System, Figure B-1. High Voltage Circuit

Models: R-22AT R-24AT

1 44
Download 44 pages 40.07 Kb
Page 7
Image 7
TWO MAGNETRON OPERATION SYSTEM

R-22AT

R-24AT

48 sec. ON

Number key

44sec. ON

Number key 9

40 sec. ON

Number key 8

36 sec. ON

Number key 7

32 sec. ON

Number key 6

26 sec. ON

Number key 5

22 sec. ON

Number key 4

16 sec. ON

Number key 3

12 sec. ON

Number key 2

8 sec. ON

Number key 1

0 sec. ON

Number key 0

NOTE: The ON/OFF time ratio does not exactly corre- spond to the percentage of microwave power, because approx. 3 seconds are needed for heat- ing up the magnetron filament.

TWO MAGNETRON OPERATION SYSTEM

Two magnetrons MG1+MG2 are equipped in order to get higher microwave power output. The primary windings of the high voltage transformers T1+T2 are connected so that each magnetron can be oscillated alternatively ac- cording to the frequency of the power supply. Refer to the Figure B-1 and B-2.

 

T2: HIGH VOLTAGE

 

TRANSFORMER

 

(REAR)

H. V. FUSE

H. V. FUSE

 

C2: H.V. CAPACITOR

H. V. RECTIFIER

H. V. RECTIFIER

T1: HIGH VOLTAGE TRANSFORMER

(FRONT)

C1: H.V. CAPACITOR

MG2: MAGNETRON (LOWER)

MG1: MAGNETRON (UPPER)

Figure B-1. High Voltage Circuit

OPERATION OF

MAGNETRON

COMMERCIAL FREQUENCY (50HZ)

POWER OUTPUT

BY MAGNETRON T1

POWER OUTPUT

BY MAGNETRON T2

Figure B-2. Operation of Magnetron

5

Page 7
Image 7
Sharp R-22AT, R-24AT Two Magnetron Operation System, Figure B-1. High Voltage Circuit, Figure B-2. Operation of Magnetron