Siemens PCIL43 manual Deployment planning, Transport, Unpacking and checking the delivery unit

Models: PCIL43

1 112
Download 112 pages 31.27 Kb
Page 23
Image 23

Deployment planning

4

4.1Transport

Although the Rack PC has a rugged design, its internal components are sensitive to severe vibrations or shock. You must therefore protect the PC from severe mechanical stress when transporting it.

You should always use the original packaging for shipment of the device.

Caution

Risk of damage to the device!

When transporting the PC in cold weather it may be submitted to extreme variations in temperature. In this situation, make sure that condensation does not develop on or inside the device.

If condensation develops, wait at least 12 hours before switching on the device.

4.2Unpacking and checking the delivery unit

Unpacking the device

Note the following points when you unpack the unit

It is advisable not to dispose of the original packing material. Keep it in case you have to transport the unit again.

Please keep the documentation in a safe place. It is required for initial commissioning and is part of the device.

Check the delivery unit for any visible transport damage.

Verify that the shipment contains the complete unit and your separately ordered accessories.

Please inform your local dealer of any disagreements or transport damages.

Please inform Siemens AG by means of the enclosed SIMATIC IPC/PG quality control report form.

SIMATIC Rack PC IL 43

4-1

Operating Instructions, Edition 09/2005, A5E00432875-01

Page 23
Image 23
Siemens PCIL43 manual Deployment planning, Transport, Unpacking and checking the delivery unit, Unpacking the device