Initial Assembly & Installation

INITIAL ASSEMBLY & INSTALLATION

Attach Dozer Lift Arm

1.See Figure 5. Assemble the dozer lift arm (B) to the dozer hitch (A) using two 1/2-13 x 1-3/4” capscrews, lockwashers, and nuts. Insert the capscrews from left to right in the holes shown.

Assemble Dozer Blade

NOTE: Once assembled, the dozer blade and hitch pivot assembly need not be separated.

1.Slide the dozer blade assembly (B) and hitch pivot assembly (A) together as shown in Figure 6.

2.Install the pivot pin (C) and secure with a cotter pin

(D) at both ends.

Tractors

A

Equipped with

 

16” Front TIres,

 

Use These Holes

 

B

 

 

Tractors Equipped with 18”

 

Front TIres, Use These Holes

Figure 5. Assemble Dozer Lift Arm

A.Dozer Hitch

B.Dozer Lift Arm

B

C

D

A

Figure 6. Assemble Dozer Blade

A.

Hitch Pivot Assy.

C. Pivot Pin

B.

Dozer Blade Assy.

D. Cotter Pin

10

Page 12
Image 12
Snapper 2137 manual Initial Assembly & Installation, Attach Dozer Lift Arm, Assemble Dozer Blade