Initial Assembly & Installation

BI

D E

F

GH

J

N

C

A

M

 

To Front

B

 

 

 

 

Cross-Over

A. Control Valve

 

 

 

Tube

 

 

 

 

B. Cotter Pin

 

 

L

 

C. Clevis Pin

 

 

 

 

D. Control Lever

 

 

 

 

E. U-Link

 

 

 

 

F. Tall Fitting

 

 

K

 

G. Short Fitting

 

 

 

 

H. 1/2” x 75” Hose w/ Female Quick Connector

 

To Back

M

I. 1/2” x 75” Hose w/ Male Quick Connector

 

 

Cross-Over

J. 23/32” x 40” Hose w/ Male Quick Connector

 

 

 

Tube

 

K. 23/32” x 40” Hose w/ Female Quick Connector

 

 

 

 

 

L. Female Quick Connector

 

 

L

M. Male Quick Connector

 

 

 

 

N. Large Fitting

 

 

 

 

Figure 26. Assemble Control Valve

Install Control Valve

1.Locate the old single spool master valve removed from tractor (A, Figure 26).

NOTE: From this point on, the old master valve will be referred to as the control valve (A, Figure 26).

2.Install the control lever (D, Figure 26) using a small clevis pin (C), the U-link (E), and small cotter pins (B) as shown.

3.Install a tall fitting (F, Figure 26) and a short fitting (G) into the control valve (A) as shown.

4.Install a male quick connector (M, Figure 26) on one of the 1/2” x 75” long hoses (I), and connect the other end of the hose to the tall fitting (F)

5.Install a female quick connector (L, Figure 26) on the other 1/2” x 75” long hose (H) and connect it to the short fitting (G).

NOTE: The quick connector ends of the 1/2” x 75” hoses attached to the control valve in steps 4 and 5 will be con- nected to the dozer hydraulic hoses later.

6.Install two large fittings (N, Figure 26) in the front of the control valve (A).

7.Install a male quick connector (M, Figure 26) on one of the 23/32” x 40” hoses (J) and a female quick con- nector (L) on the other 23/32” x 40” hose (K).

17

Page 19
Image 19
Snapper 2137 manual Install Control Valve, Assemble Control Valve