5.Remove the bypass hose (Figure 41) from the cross- over tubes.

See Figure 42.

6.Connect the 23/32” x 40” hoses (B) from the control valve to the the cross-over tubes (A).

7.Connect the 1/2” x 75” hoses (C) from the control valve to the dozer hoses (D).

8.Lubricate the dozer as shown in the Maintenance section of this manual.

9.Perform all adjustments as shown in the Adjustments section of this manual.

Normal Installation

Do Not Kink

Bypass Hose

Figure 41. Remove Bypass Hose

A

B

D

C

Figure 42. Connect Hydraulic Hoses

A.Cross-Over Tubes

B.23/32” Control Valve Hoses

C.1/2” Control Valve Hoses

D.1/2” Dozer Blade Hoses

23

Page 25
Image 25
Snapper 2137 manual Remove Bypass Hose