Initial Assemble & Installation

8.Mount the control valve (A, Figure 27) to the support arm (D) using two 1/4-20 x 1-3/4” taptite screws (E).

9.Using the 23/32” x 40” hose with the male quick con- nector (B, Figure 27), connect the IN port of the con- trol valve (A) to the front cross-over tube (A, Figure 28).

10.Using the 23/32” x 40” hose with the female quick connector (C, Figure 27), connect the OUT port of the control valve (A) to the back cross-over tube (B, Figure 28).

BTo Front Cross- Over Tube

 

E

 

C

To Back Cross-

D

A

Over Tube

 

Figure 27. Control Valve

A.Control Valve

B.23/32” x 40” Hose w/ Male Quick Connector

C.23/32” x 40”Hose w/ Female Quick Connector

D.Support Arm

E.1/4-20 x 1-3/4” Taptite Screws

B

A

 

 

To Dozer

 

Hoses

Figure 28. Cross-Over Tubes

A. Front Cross-Over Tube B. Back Cross-Over Tube

18

Page 20
Image 20
Snapper 2137 manual To Front Cross- Over Tube To Back Cross