
Initial Assemble & Installation
8.Mount the control valve (A, Figure 27) to the support arm (D) using two 
9.Using the 23/32” x 40” hose with the male quick con- nector (B, Figure 27), connect the IN port of the con- trol valve (A) to the front 
10.Using the 23/32” x 40” hose with the female quick connector (C, Figure 27), connect the OUT port of the control valve (A) to the back 
BTo Front Cross- Over Tube
  | E  | 
  | C  | To Back Cross- | |
D  | A  | Over Tube  | |||
  | 
Figure 27. Control Valve
A.Control Valve
B.23/32” x 40” Hose w/ Male Quick Connector
C.23/32” x 40”Hose w/ Female Quick Connector
D.Support Arm
E.1/4-20  x 1-3/4”  Taptite Screws
B  | A  | 
  | |
  | To Dozer | 
  | Hoses | 
Figure 28. Cross-Over  Tubes
A. Front Cross-Over  Tube B. Back Cross-Over  Tube
18