9Switch ON machine for a short period of time and check rotational direction. The rotational direction can be seen at the discharge air fan of the drive motor (observe running direction arrow).

9Switch ON hydraulic unit for a short time and check rotational direction.

9Allow machine to run for approximately 10 minutes without shredding material.

9Connect material discharge device and in-feed device; check rotational direction drives.

9Feed grinding material uniformly. Too much grinding material can lead to overload of the machine.

9Check the temperature of the shredded material if necessary.

9Monitor the ammeter. This displays the present current consumption and gives information on the load of the machine.