Chapter 3: Installation

Chapter 3: Installation

3-1 Uncrating the Equipment

Requirements at Application Site

Check the application site to make sure it conforms to the qualifications listed below.

The site is an enclosed space.

The ground has sufficient load-bearing capacity (Refer to “Technical Specifications” in the Appendix for machine weight). The unevenness of the ground surface may not exceed 5 mm.

The machine must be freely accessible from all sides.

There must be sufficient room available for operating and service personnel.

Spatial requirements: Refer to “Drawing and Diagrams” in the Appendix for machine dimensions . All hinged parts must be able to be opened completely.

Vibration-free environment.

The site has sufficient lighting.

The machine may not be exposed to direct radiation caused by radiators or the sun.

Room temperature: +41 to 104 °F (+5° to +40°C)

Relative atmospheric humidity according to DIN 40040:

15 to 70 % (indoor)

NOTE: By humidity levels higher than 70 %, apply anticorrosive agent to the metallic-finished machine parts. Insulation for the tropics is also necessary.

The machine may not be operated within range of static discharges or strong magnetic fields as this could lead to faults in the machine control system.

Unloading and Installing the Machine

The machine and components are packed so they arrive safely. Use a suitable crane or forklift for unloading the packaged machine and/or components.

1.Remove the packaging material and all transportation safety devices after unloading the machine.

2.In the case that the shredder and its accessory components have been delivered as individual items, mount them at the site of application in accordance with the Assembly Drawing. This is the only way to guarantee there are sufficient piping parts, tubing, and cable connections, and that the linking places match.

BJ5-615

Chapter 3: Installation

23 of 85

Page 23
Image 23
Sterling 1500, 1200, 2000, SMS 850 manual Installation, 3-1Uncrating the Equipment, Requirements at Application Site