Sterling BP818, BP814, BP810 manual Shipping Information, 3-1Unpacking and Inspection

Models: BP810 BP818 BP814

1 54
Download 54 pages 23.11 Kb
Page 19
Image 19
Shipping Information

3

Shipping Information

 

 

3-1 Unpacking and Inspection

You should inspect your granulator for possible shipping damage.

Thoroughly check the equipment for any damage that might have occurred in transit, such as broken or loose wiring and components, loose hardware and mounting screws, etc.

3-2 In the Event of Shipping Damage

Important!

According to the contract terms and conditions of the Carrier, the responsibility

of the Shipper ends at the time and place of shipment.

Notify the transportation company’s local agent if you discover damage

Hold the damaged goods and packing material for the examining agent’s inspection. Do not return any goods before the transportation company’s inspection and authorization.

File a claim with the transportation company. Substantiate the claim by referring to the agent’s report. A certified copy of our invoice is available upon request. The original Bill of Lading is attached to our original invoice. If the shipment was prepaid, write us for a receipted transportation bill.

Advise the shipping department regarding your wish for assistance and to obtain an RMA (return material authorization) number.

3-3 If the Shipment is Not Complete

Check the packing list as back-ordered items are noted on the packing list. You should have:

;

;

;

Granulator

Bill of lading

Packing list

Page 19 of 54

Page 19
Image 19
Sterling BP818, BP814, BP810 manual Shipping Information, 3-1Unpacking and Inspection, 3-2In the Event of Shipping Damage