SSE 5 BL

5.1. Maintenance intervals

Daily:

Check warning signs on equipment for good legibility and completeness

 

Clean the filter: Use compressed air to blow through the filter (according

 

to the accumulation of dust)

Monthly:

Check function of the device plug

Every 6 months:

Check all electrical and mechanical connections for tight fit

 

Replace the filter (according to the accumulation of dust)

Annually:

Replace outlet valve sealing.

 

Adjust valve switch

FThe given maintenance intervals are average values.

Check whether in your individual case the maintenance intervals must be shortened.

5.2. Servicing the conveyor

￿Disconnect the unit from mains supply by the device plug.

Depressurize all system sections of the equipment

Disassembly the unit.

Maintenance 10

Page 24
Image 24
Sterling SSE-5 BL operating instructions Maintenance intervals, Servicing the conveyor