SSE 5 BL

Table of contents

 

 

1.

1. General instructions

1-1

 

1.1. Warnings and symbols

1-2

 

1.2. Explanations and information

1-3

 

1.3. Legal basis

1-3

 

1.4. Fields of applications

1-3

 

1.5. Notes on usage

1-3

2.

Safety instructions

2-1

 

2.1. For your safety

2-2

 

2.1.1.

General

2-2

 

2.1.2.

Assembly

2-3

 

2.1.3.

Operation

2-4

 

2.1.4.

Maintenance

2-4

 

2.2. For the operating safety of the equipment

2-5

3.

Putting into operation

3-1

 

3.1. Checking the pipe system

3-2

 

3.2. Adjusting the suction pipes

3-3

 

3.3. Setting the controller

3-4

 

3.4. Initial conveying operations

3-5

 

3.5. Switching off the unit

3-5

4. Error and error correction

6

5.

Maintenance

8

 

5.1. Maintenance intervals

10

 

5.2. Servicing the conveyor

10

 

5.2.1.

Changing the sealing ring of the outlet flap

............................................ 11

 

5.2.2.

Adjusting the flap switch

12

 

5.2.3.

Cleaning the unit

13

 

5.3. Replacing carbon brushes at turbine

Error! Bookmark not defined.

6.

Functional description

15

 

6.1. General

...............................................................................................................

16

 

6.2. Controller

17

7. Transport, Assembly and Storage

19

 

7.1. Transport and Packing

20

 

7.2. Assembly

20

 

7.3. Storage

...............................................................................................................

20

8.

Assembly instructions

21

 

8.1. Assembly

22

 

8.2. Mounting on the processing machine

24

 

8.3. Mounting onto a machine hopper

24

 

8.4. Mounting onto mixing hoppers with lateral inlet

25

 

8.5. Mounting onto dosing station DT 30

25

 

8.6. Material feed

26

 

8.7. Mounting the suction pipe MV

26

 

8.8. Pipework

27

 

8.9. Electrical connection

27

4

Page 5
Image 5
Sterling SSE-5 BL operating instructions Table of contents