SSE 5 BL
Setting the line clear time
Press the
then the “arrow key”.
&The line clear time which was last selected appears in the display.
FIf no line clear valve has been installed enter “0".
3.4. Initial conveying operations
Metal shavings may be inside the pipe from cutting down pipes into lengths. These are pulled during the first conveying process and collected in the separator.
FThis material should not be used again.
3.5. Switching off the unit
Disconnect the unit from mains supply by the device plug.
Putting into operation