2.2. For the operating safety of the equipment

Never change settings if the consequences are not precisely known.

Use only original Sterling spare parts.

Please observe the maintenance schedule.

Keep record of all maintenance and repair work.

Please note that electronic components may be damaged by static discharge.

Check all electrical connections for proper fit before the equipment is taken into operation for the first time and at regular intervals.

Please ensure that the permitted operation temperature lies between 0 °C and +45 °C (32 to +113 °F).

Please ensure that the permitted storage temperature lies between -25 °C and +55 °C (-13 to +131 °F).

Note down all data which you have entered into the control system.

Please ensure that all plugs are correctly plugged in.

The operating instructions of the connected machines must be followed.

Operate the device only if all its components are grounded.

Never adjust sensors without exact knowledge of their function.

Please note that a compressed air supply is required for the operation of the unit (only SSE-2 with active cleaning, optional).

Never set a higher operating pressure than 6 bar for the hopper loaders (system overpressure). Align the suction tubes correctly.

The unit should be installed in such a way that the outlet flap oscillates at right angles to the moving direction of the equipment.

The load-bearing capacity of the machine flange should be adhered to.

Please observe that a level indicator is required when conveying from granulators.

Safety instructions 2-5

Page 14
Image 14
Sterling SSE-5 BL operating instructions For the operating safety of the equipment