SSE 5 BL

8.10. Compressed-air supply

For operating the cleaning device, a compressed-air supply is necessary. Check compressed-air piping for correct installation and assembly.

Check fittings, length and quality of the hose connections for agreement with requirements. The operating pressure is 5-6 bar (72-87 PSI) (system overpressure).

Check the compressed-air supplied by the plant’s supply network.

Adjust compressed-air pressure to 5-6 bar (72-87 PSI) (system overpressure). Connect the unit to the plant’s supply network by means of a hose.

L F

Depressurize compressed-air supply lines which must be opened.

Compressed air must be dewatered, dustfree and oilfree. Install a maintenance unit if required.

Adjust pressure to a max. value of 6 bar (87 PSI) (system overpressure).

8.11. Installing the accessories

FSee chapter “Accessories”.

Assembly instructions 30

Page 44
Image 44
Sterling SSE-5 BL operating instructions Compressed-air supply, Installing the accessories