Sterling SXS Series specifications 5-1Preventative Maintenance Schedule

Models: SXS Series

1 73
Download 73 pages 34.8 Kb
Page 32
Image 32
Chapter 5: Maintenance

Chapter 5: Maintenance

5-1 Preventative Maintenance Schedule

Only trained and specialized personnel should carry out maintenance work.

Maintenance Plan

WARNING!

Danger caused by electrical voltage and starting the machine during maintenance work. Death can result!

ALWAYS turn main switch to 0, safeguard using a padlock, and attach a warning sign while carrying out maintenance work.

The tasks for maintenance work are described below.

Perform the following after every 8 operation hours:

Check protective devices.

Check cutting knife mountings.

Check condition of cutting knives.

Perform the following after every 40 operation hours:

Check V-belt tension force and V-belt condition.

Check all screws of the machine for a tight fit.

Check wearing parts.

Check hydraulic oil level and consistence.

Per form the following after every 2000 operation hours:

Change hydraulic oil

Check gearbox oil level

Yearly maintenance:

The purpose of yearly maintenance is primarily to check the general condition of the machine and to arrange for the supply of any necessary replacement parts. A service engineer can carry out this request.

BJ5-620

Maintenance

32 of 73

Page 32
Image 32
Sterling SXS Series specifications 5-1Preventative Maintenance Schedule