Chapter 3: Installation
3-1 Uncrating the Equipment
Requirements at Application Site
Check the application site to make sure it conforms to the qualifications listed below.
•The site has enclosed space.
•The ground has sufficient
•The machine must be freely accessible from all sides.
•There must be sufficient room for operating and service personnel.
•Spatial requirements: Refer to the “Drawings and Diagrams” in the Appendix for machine dimensions. All hinged parts must be able to be opened completely.
•The site is a
•The site has sufficient lighting.
•The machine may not be exposed to direct radiation caused by radiators or the sun.
•Room temperature: +41 to 104 °F (+5° to +40°C)
•Relative atmospheric humidity according to DIN 40040:
15 to 70 % (indoor)
NOTE: By humidity levels higher than 70 %, apply anticorrosive agent to the
•The machine may not be operated within range of static discharges or strong magnetic fields as this could lead to faults in the machine control system.
Unloading and Installing the Machine
The machine and components are packed so they arrive safely. Use a suitable crane or forklift for unloading the packaged machine and/or components.
1.Remove the packaging material and all transportation safety devices after unloading the machine.
2.In the case that the shredder and its accessory components have been delivered as individual items, mount these at the site of application in accordance with the Assembly Drawing. This is the only way to guarantee there are sufficient piping parts, tubing, and cable connections, and that the linking places match.
Installation | 22 of 73 |