SUB- ZE RO ICE MACHINE I NSTA LL AT IO N
INST ALL ATI ON
IN ST ALLATIO N PR O C EDU RE
1)Prepare the site by following the instruc- tions under Electrical Requirements and Plumbing Requirements on pages
2)Remove ice machine from carton.
3)Inspect for damage.
4)Remove literature/warranty packet and drain hose from inside the ice machine.
5)Adjust leg levelers. Refer to Leveling on page 12.
6)Reverse door if desired. See pages
7)Gravity drain model: Install drain hose to drain on back of ice machine and route to open site drain. Refer to Plumbing Require- ments on pages
Pump model: Route drain tubing through drain fitting on the back of the ice machine and install drain hose on drain pump.
Route other end of drain tubing to drain site. Refer to Plumbing Requirements on pages
8)Use compression fitting to connect the Water Inlet on back of ice machine to the prepared 1/4" ID cold water line. Refer to Plumbing Requirements on pages
9)Open the
10)Check all visible connections for water leakage. Failure to do so could cause flooding.
11)Connect electrical plug to grounded (three- prong), polarized outlet. See Electrical Requirements on page 7.
The ice machine must be grounded in accordance with national and local electrical codes. Do not use an extension cord or adapter.
Improper water supply and drain connec- tions can result in personal injury and substantial property damage. These connections are the responsibility of the owner/operator.
12)Place ice machine back in position and check leveling again. Make any necessary adjustments.