SUB- ZE RO ICE MACHINE I NSTA LL AT IO N
INST ALL ATI ON
LEV ELI N G
1)Adjust the levelers close to desired height.
2)Move the bin into its final position.
3)Level the ice machine to assure that the bin door closes and seals properly. Use a level on top of the bin. Turn the base of each foot as necessary to level the bin. Refer to the illustration below.
RE VE RS E T H E DO O R SW I N G
The hinged side of the door may be reversed to the other side if desired.
The
SE CU R E THE IC E MAC HINE
To secure the ice machine, install two
#8 x 1/2" flat head screws through each hinge. Refer to the illustration below.
SI DE PAN ELS
With the
Panels should be fastened to the floor and walls using ’L’ brackets (hardware not provided). To help you move the unit into place, rout out an area in the floor so the ‘L’ bracket will sit flush with the floor level. Brackets and screws are provided for mounting the unit to adjoining cabinets and side panels.
IMPORTANT NOTE: The plastic molding which covers the top area of the door, packaged with the ice machine, is required for this procedure.
1)To begin, remove the four screws that secure the door hinges to the ice machine. Refer to the illustration below.
NOTE: Remove the shim located between the cabinet and bottom hinge, this shim will transfer to the left side bottom hinge.
2)Remove the hinges from the door by removing the four screws (two each hinge) that secure the hinges to the door. Refer to the illustration below.
Flat Head |
Screws |
Leg leveler | Securing the ice machine |
Step 1
Remove door
Step 2 |
Step 3 |
Step 2 |
Remove hinges and plastic trim piece
12