Sub-Zero UC-15IO manual D Oo R Pane L I Ns Tallation, Doo R Pane L D Imensi, O Ns, Inst All Ati On

Models: UC-15I UC-15IO

1 32
Download 32 pages 42.04 Kb
Page 14
Image 14
D OO R PANE L I NS TALLATION

SUB- ZE RO ICE MACHINE I NSTA LL AT IO N

PANEL D E SIGN

Additional panel design information can be found in the Sub-Zero design guide. Check our website at subzero.com.

INST ALL ATI ON

D OO R PANE L I NS TALLATION

You should be sure of the door panel size and placement before proceeding with the installa- tion. If you have questions, contact your Sub-Zero dealer or cabinet supplier. Instruc- tions regarding sizing of the door panel are provided in the Sub-Zero design guide.

For door handle hardware, a D-style pull centered on the edge opposite the door hinge side is recommended. Screw heads may have to be countersunk to ensure that the hardware does not interfere with the panel fitting flush with the unit door.

DOO R PANE L D IMENSI

O NS

 

 

 

Door Panel Width – 1/8" (3) reveal

15" (381)

Door Panel Height – 1/8" (3) reveal

 

4" (102) toe space

 

30 3/8" (772)

Door Panel Thickness

 

5/8" (16) min

Door Panel Weight

15 lbs (6.8 kg) max

 

 

 

Dimensions may vary + 1/8" (3).

Remove the handle side bracket attached to the front of the door and set aside.

Place the door panel lying face down on a protected surface to ensure the front is not scratched or damaged.

Position the template provided flush with the upper edge of the door. Be sure you are following the exact location for the RH or LH door position. Refer to the illustration below.

IMPORTANT NOTE: Remember you are viewing the door panel from the back side in the illustration. The overall size of the panel shown is the minimum size necessary to cover the door of the unit. The exact measurements of your door panel may vary depending on the particular installation you are following.

Once you have located the proper position for the hardware, mark the holes, remove template, and drill pilot holes for mounting of the hardware. We recommend starting the first few holes, positioning the hardware, drilling remaining pilot holes, and securing the mounting brackets with the #8 x 1/2" screws. Refer to the illustrations below.

Flush with Top and Side

of Panel

Right-hand door panel

Left-hand door panel

14

Template position

Page 14
Image 14
Sub-Zero UC-15IO manual D Oo R Pane L I Ns Tallation, Doo R Pane L D Imensi, O Ns, Inst All Ati On