C H A P T E R 1

Setting Up the Sun Blade 2500

Workstation

This chapter includes information about the following topics:

■Safety and Compliance Information

■Planning the Installation Process

■Unpacking the Workstation

■Cabling the Workstation

■Powering On the Workstation

■Powering Off the Workstation

Safety and Compliance Information

Read the document, Important Safety Information for Sun Hardware Systems (816-7190). The document is included with the Sun Blade 2500 workstation.

More safety and compliance information can be found in the Sun Blade 2500 Safety and Compliance Guide (817-5120). This guide is available online at:

http://www.sun.com/documentation/

Planning the Installation Process

Use the following flowchart as a process tool to assist you with installation of the Sun Blade 2500 workstation.

1

Page 17
Image 17
Sun Microsystems 2500 manual Safety and Compliance Information, Planning the Installation Process